ADU & DADU Contractor — King County, WA

Add a Legal Dwelling Unit
to Your King County Property

From permit application to final walkthrough — Prolific handles design-build ADU and DADU projects across Federal Way, Issaquah, Renton, Kent, and greater King County.

$180KAverage ADU Cost (King County)
6–12moTypical Timeline Permit to Move-In
$1,800+Monthly Rental Income Potential
3–5yrAverage ROI Payback Period

What We Build

Every ADU project is custom-designed for your lot, your goals, and King County code.

🏡

Detached ADU (DADU)

A standalone dwelling in your backyard. Most flexible for rental or multigenerational living. Requires setback compliance and separate utility connections.

🏗

Attached ADU

Connected to the primary home via a shared wall. Lower cost than detached, faster permitting. Ideal for in-law suites or long-term rental income.

🏠

Junior ADU (JADU)

Converted from existing interior space — garage, basement, or bonus room. Lowest cost entry point. Limited to 500 sq ft per King County code.

The King County Permitting Process

Prolific handles every step. Most homeowners have never pulled a permit — we've done hundreds.

1

Site & Zoning Review

We verify your parcel's zoning, setbacks, lot coverage, and utility capacity before design starts. Catches 80% of project-killers on day one.

2

Design & Engineering

Architectural plans drawn to King County standards. Structural engineering included where required. Typical design phase: 3–6 weeks.

3

Permit Submission

We submit to King County DPER or the applicable city (Federal Way, Renton, Issaquah, Kent). Electronic submission with full plan set.

4

Review & Corrections

County review typically takes 6–12 weeks. We respond to all correction requests and manage the back-and-forth until permit issuance.

5

Build & Final Inspection

Construction with milestone inspections. Final inspection and certificate of occupancy required before the unit can be rented or occupied.

Cost Ranges for King County ADUs

Rough estimates — every project varies by site, size, and finish level. Free estimate available after a site visit.

ADU TypeSize RangeTypical Cost Range
Junior ADU (JADU)Up to 500 sq ft$60,000 – $120,000
Attached ADU400–800 sq ft$120,000 – $200,000
Detached ADU (DADU)400–1,200 sq ft$160,000 – $320,000

Ready to Add a Unit to Your Property?

Free site consultation. We'll tell you what's possible on your lot before you spend a dollar.

Get Your Free ADU Estimate

Prolific's Differentiator

While We're Restoring Your Home, Let's Make It Better Than Before

Most contractors patch the damage and leave. We use the restoration as a launchpad — pairing insurance coverage with a remodel that upgrades what you had.

Storm + Remodel

Federal Way — Hail Damage + Kitchen Upgrade

Insurance covered the roof and siding. While we had the crew on-site, the homeowners financed a kitchen remodel they'd been putting off for years. One mobilization, two wins.

Water + Addition

Renton — Burst Pipe + Primary Bath Expansion

A burst pipe triggered an insurance claim for the subfloor and drywall. We rebuilt the bathroom larger than it was — same timeline, carrier paid the base, owner paid the delta.

Fire + Rebuild

Issaquah — Garage Fire + ADU Conversion

Garage total loss became a permitted two-car garage with a studio ADU above. Insurance rebuilt what burned. The ADU now generates rental income to offset the mortgage.

Insurance Claim? We Handle Everything.

Your Insurance Company Has Adjusters.
Now You Have Us.

STORM DAMAGE RESPONSEthousands more for homeowners just like you.

ADU and DADU Construction in King County: Rules, Costs, and What to Expect in 2026

Accessory dwelling units have become one of the hottest topics in King County real estate. Whether you call them ADUs, DADUs, backyard cottages, or in-law suites, these secondary living spaces are transforming how Eastside homeowners use their property.

At Prolific Design-Build and Restoration, we’ve been building ADUs and DADUs across Issaquah, Bellevue, Sammamish, Redmond, and surrounding communities. Here’s what you need to know if you’re considering one.

ADU vs DADU: What’s the Difference?

An ADU (Accessory Dwelling Unit) is a self-contained living space built within or attached to your existing home. Think of a basement conversion with its own kitchen, bathroom, and separate entrance. A DADU (Detached Accessory Dwelling Unit) is a standalone structure on your property — the classic “backyard cottage.”

Both are fully permitted, code-compliant living spaces with their own kitchen, bathroom, and sleeping area. The main difference is whether the unit shares a wall with your primary residence.

Current Regulations in King County

Washington state passed legislation in recent years that significantly expanded ADU rights for homeowners. Most single-family zones in King County now allow both an attached ADU and a detached ADU on the same lot, meaning you could potentially have three dwelling units on one property.

Key requirements vary by jurisdiction. Size limits typically cap at 1,000 square feet for a DADU, though some cities allow up to 1,200. Setback requirements, height restrictions, and design standards differ between Issaquah, Bellevue, Kirkland, and unincorporated King County. Owner-occupancy requirements have been relaxed in many jurisdictions, opening the door for rental income even if you don’t live on-site.

Parking requirements have also been reduced or eliminated in many areas, especially near transit. This is a significant change that makes ADU projects more feasible on smaller lots.

What Does an ADU Cost to Build?

In the King County market, a basement ADU conversion typically costs $80,000 to $150,000 depending on the condition of the existing space, plumbing access, and finish level. A new DADU built from the ground up generally runs $180,000 to $350,000 for a quality build with proper foundations, utilities, and finishes.

The main cost drivers are site preparation, foundation work, utility connections (sewer, water, electrical), and finish quality. Permit fees add $5,000 to $15,000 depending on the city. Impact fees, which fund schools and transportation, can add another $5,000 to $20,000 in some jurisdictions.

Why Homeowners Are Building ADUs

The reasons we hear most often are rental income, multigenerational living, and property value. A well-built DADU in Bellevue or Sammamish can generate $2,000 to $3,500 per month in rental income. For multigenerational families, having aging parents or adult children in an independent space on the same property offers both proximity and privacy.

From a value perspective, an ADU can add significant equity to your property. In strong Eastside markets, a quality DADU can increase property value by $150,000 to $250,000 or more.

The Build Process

A typical DADU project takes 6 to 10 months from design to move-in. The process starts with a feasibility assessment — we evaluate your lot, check zoning requirements for your specific city, and confirm utility access. From there, we move into design, permitting, and construction.

At Prolific, we manage the entire process as a design-build firm. That means one team handles architecture, engineering, permitting, construction, and final inspection. No juggling multiple contractors or playing middleman between your architect and builder.

Interested in exploring an ADU or DADU on your King County property? Schedule a free feasibility consultation with Prolific Design-Build and Restoration. We’ll assess your lot, walk you through the local requirements, and give you a realistic cost estimate.

Leave a Comment

Your email address will not be published. Required fields are marked *

Dealing with storm damage? We're here — call now or submit your info and we'll call you within the hour.

We Got Your Request

We respond within 2 business hours — same day for emergencies.

A member of our team will reach out shortly to schedule your free estimate or inspection. Here's what to have ready when we call:

What to Have Ready

  • Photos of the damage or area of concern (phone photos are fine)
  • Your insurance carrier name and claim number (if applicable)
  • Best time and number to reach you
  • A rough idea of when the damage occurred or project timeline
Back to Home

Prolific Design-Build & Restoration — Federal Way, WA

📋 Get a Free Estimate